Layer map

This page is RA-a. It places every package in the uv workspace on the ISA-95 and Purdue level scales. It names the compute tier that runs each one, and the latency budget that tier carries. Gate VAL-GATE-TIER-001 reads the package table below. The gate fails on one unfilled cell, or on one package with no row.

Section 4 of ARCHITECTURE.md maps the architecture components. This page maps the distributions, which is a different list. A component can span several packages. A package can be a library that no component names.

1. The levels

ANSI/ISA-95 is a paid standard and its text is not reproduced here. The table below states the level meanings this repository uses. The mapping is a design decision, not a quotation.

Level ISA-95 Purdue
0 The physical process The physical process
1 Sensing and actuation, PLC analog Basic control: sensors, actuators, controllers
2 Monitoring and supervisory control, SCADA and historian analog Area supervisory control: HMI, SCADA
3 Manufacturing operations management, MES and analytics analog Site operations: MES, historian, scheduling
3.5 Not an ISA-95 level Industrial DMZ: the mediated boundary
4 Business planning and logistics, business and agent layer Business logistics: ERP, planning

2. The compute tiers

Compute placement is an explicit decision, not a consequence of where code was easy to run. Section 6 of ARCHITECTURE.md states four tiers, each with a latency budget.

Tier Location Physical analog Latency budget
0 On-device Sensor or embedded controller Microseconds to a few milliseconds
1 Edge gateway, per area Gateway appliance on the OT segment Safety checks under 100 ms, flagging under 1 s
2 Site Server room, DMZ and site network Seconds to minutes
3 Network Central or hosted Minutes to hours, no interactive budget

One rule governs the placement. A function may run at a lower tier than its budget needs, never at a higher one. A safety check may move down to tier 0 when the signal is there. It may never move up to tier 2, because a tier-2 placement makes the decision depend on a network link.

3. The latency budgets

Each budget below is a declared target for a class of decision. Section 6 of ARCHITECTURE.md is the source, and every row keeps the name that source gives it. Section 5 of this page says what these budgets are not.

Decision class Budget Enforced at
Safety interlock Under 100 ms Tier 0 or 1
Machine protection trip Under 100 ms Tier 0 or 1
Anomaly flag Under 1 s Tier 1
Operator dashboard update Under 2 s Tier 2
Finding to work order Seconds to minutes Tier 2
What-if experiment Minutes Tier 2 or 3
Planning and optimization Hours Tier 3

4. The workspace packages

Every row is one distribution in the uv workspace. The Package cell is the name you install.

Package ISA-95 Purdue Compute tier Latency budget Real-world counterpart
twinflow-schemas Cross-cutting Cross-cutting 0 to 3 The caller's budget Schema registry in a UNS platform
twinflow-rng Cross-cutting Cross-cutting 0 to 3 The caller's budget No plant counterpart. The determinism substrate
twinflow-kernel Cross-cutting Cross-cutting 0 to 3 The caller's budget No plant counterpart. The simulation runtime
twinflow-config Cross-cutting Cross-cutting 0 to 3 The caller's budget The facility model in a UNS platform
twinflow-twin L0 L0 2 Seconds to minutes The physical process. As software, an AnyLogic-class discrete-event simulation
twinflow-sensors L1 L1 0 and 1 Microseconds to a few milliseconds at tier 0, under 100 ms at tier 1 Field instrumentation, and the protocol gateway in front of it
twinflow-storage L2 L3, published into L3.5 2 Seconds to minutes Plant historian, the L2 system of record for time-series
twinflow-agent L4 L4 3 Minutes to hours, no interactive budget Control tower and operations copilot
twinflow-api L2 for live line state, L4 for findings and KPIs L2 and L4 2 Under 2 s for an operator dashboard update The read API behind an HMI and a BI tool
twinflow-dashboard L2 for live line state, L4 for findings and KPIs L2 and L4 2 Under 2 s for an operator dashboard update HMI for the line view, BI for the analytics view
twinflow-roadmap Outside the model Outside the model Build time, not run time No run-time budget Program management tooling

Four of those rows say Cross-cutting in both level columns. twinflow-schemas, twinflow-rng, twinflow-kernel, and twinflow-config are libraries. Each one runs inside the process of whatever calls it, so it sits at no single level and at no single tier. Their budget cell says the same thing: the caller owns the budget, and the library adds none of its own. Writing a number there would state a budget nobody set.

twinflow-twin is the L0 process, because in this system the twin stands in for the plant. Its software runs at tier 2, beside the historian, because a process model needs the full site state.

twinflow-api has no row of its own in section 4 of ARCHITECTURE.md. It is the read path the dashboard goes through, so it takes the dashboard's levels and the dashboard's split.

twinflow-roadmap is the one member outside the layer model. It is program management as code, it lives under tools/ rather than under packages/, and nothing at run time imports it. It still owns a row, for two reasons. The gate says every package in the uv workspace, and tools/roadmap is a workspace member. A reader who installs it alone needs to be told that it models no part of a plant, and a silent exclusion tells them nothing.

5. What the budget column is not

Every budget on this page is a declared target. Not one of them is a measurement. The measured decision latency for each tier arrives with WP-P6-W1-01, which measures the four compute placement tiers:

TBD.

A budget belongs in the table because it is a decision, and a decision is knowable the day the package is placed. A measurement belongs behind the marker above, where scripts/checks/metric-marker-gate.sh counts it. The layer map gate rejects a marker inside the four checked columns for that reason.

6. Two components that sit at two levels

Component Why it is two Levels
Dashboard Two products on one page: a live view of the running line, and an analytics view of findings and KPIs L2 and L4
UNS broker Both the area-level message bus and the mediated crossing point, which is how a real UNS broker is deployed L2 and L3.5

Neither split is an unresolved argument. Each names a component that does two jobs at two levels, and collapsing it to one level would misplace one of them.

7. How this page is checked

scripts/checks/layer-map-gate.py reads the table under the <!-- layer-map:packages --> anchor. It takes the member list from tool.uv.workspace.members in the root pyproject.toml. That is the same route scripts/checks/workspace-members-gate.py takes, so the two gates cannot disagree about what a member is.

Run it:

uv run python scripts/checks/layer-map-gate.py
uv run python scripts/checks/layer-map-gate.py --selftest

The gate fails on any one of these:

  • a member with no row
  • a checked cell holding a placeholder
  • a metric marker inside a checked column
  • a renamed or missing column
  • a row naming a package the workspace does not hold

The selftest breaks each of those in turn. It fails when the rule it broke stays quiet.